Operations

  1. 2024 guidance range of 20,000 oz to 25,000 oz.
  2. For complete mineral resource and reserve technical information, refer to the Reserves and Resources page and our technical reports.
  3. Refer to the pre-feasibility study (PFS) on the Marmato Lower Mine Project with an effective date of June 30, 2022, see “Technical Disclosure and Qualified Person” in the Appendix.
  4. Base Case.
  5. AISC per ounce is a non-GAAP measure; please refer to the Non-GAAP Measures notice
  6. Non-GAAP measure. Net cash flow defined as operating margin less sustaining and non-sustaining capex after working capital adjustments, before tax.
  • Marmato Lower Construction – September 2024 Update

    September 2024 Update